PNW at a glance
The past year
Chart+14.4% $102.01, close Nov 23
- From the highest close
- −6.7%
- Vs the 200-day average
- +0.7%
Short interest
History13.1M shares
- Of shares outstanding
- 10.8%
- Since the last report
- +4.8%
- Days to cover
- 9.2 days
- Settled
- Oct 30, 2026
Insider buying, 7 days
FilingsNone filed this week
- Form 4s filed
- Nov 18 – Nov 24
Top investors
Funds1 of 37 funds hold it
- Ray Dalio
- 0.1%
- Latest 13F filings
- 0 added · 1 cut
Understand the Business
Why the Stock Moved
Period-matched expectations history is not yet available. Current metrics are not a substitute for a historical explanation.
PNW price history
Loading recent earnings…
Investment thesis
What must happen next
APS’s planned generation and grid investments will translate into sustained top‑line and cash‑flow growth only if regulators allow those costs into rate base and provide cost recovery via the 2025 Rate Case and subsequent proceedings.StrengtheningMateriality: High
Revenue increased from $3.803B (FY2021) to $5.340B (FY2025) (fundamentals). If allowed, regulated cost recovery compounds revenue and operating cash flow; if disallowed, growth becomes earnings-dilutive and the stock’s valuation erodes.
Watch: Arizona Corporation Commission rejects or materially reduces recovery for the 2025 Rate Case additions or lowers allowed ROE.
Supporting sources
Source notes are factual paraphrases; read the original disclosures below.
Revenue increased from $3.803B (FY2021) to $5.340B (FY2025) (fundamentals).
Open source ↗Palo Verde ownership provides low‑carbon, high‑capacity baseload that underpins APS’s reliability profile and regulatory positioning, helping preserve revenue stability and favorable cost-of-service treatment.StrengtheningMateriality: High
MD&A/Business: APS owns/leases a combined ~29.1% of Palo Verde units and describes Palo Verde as a foundational carbon‑free resource. Palo Verde’s continuous output reduces the need for higher‑cost replacements, supports reliability targets and can favorably influence regulatory outcomes on resource portfolios and rates.
Watch: Material Palo Verde outages or an NRC license action that reduces availability or imposes large remediation costs.
Supporting sources
Source notes are factual paraphrases; read the original disclosures below.
MD&A/Business: APS owns/leases a combined ~29.1% of Palo Verde units and describes Palo Verde as a foundational carbon‑free resource.
Open source ↗Targeted wildfire mitigation and grid‑hardening investments (supplemented by DOE grants) will materially reduce catastrophic outage risk and regulatory/litigation exposure, preserving reliability and limiting large cash‑flow volatility.HoldingMateriality: Medium
Operating cash flow increased from $1.207B (FY2021) to $1.805B (FY2025), indicating capacity to fund resiliency programs. If mitigation successfully reduces large loss events and liabilities, APS preserves operating cash flow and avoids punitive regulatory penalties; if mitigation fails or events occur, APS faces large one‑time costs and reputational/regulatory damage.
Watch: A major wildfire in APS’s service territory causing substantial damage and customer harm leading to regulatory fines or costly settlements.
Supporting sources
Source notes are factual paraphrases; read the original disclosures below.
Operating cash flow increased from $1.207B (FY2021) to $1.805B (FY2025), indicating capacity to fund resiliency programs.
Open source ↗The subscription model for large customers combined with competitive ASRFP procurement will allow APS to serve incremental load (data centers, manufacturers) while ensuring new customers fund required capacity, preventing margin dilution for legacy customers.HoldingMateriality: Medium
MD&A: APS plans a subscription model for large load customers and uses ASRFPs to competitively procure resources (most recent ASRFP issued 2025). If the model works and is accepted by regulators, incremental load expands rate base and EPS without socializing costs; if regulators or customers reject it, APS may need to absorb costs or slow capacity additions, compressing returns.
Watch: ACC rejects subscription construct or imposes conditions that make it uneconomic.
Supporting sources
Source notes are factual paraphrases; read the original disclosures below.
MD&A: APS plans a subscription model for large load customers and uses ASRFPs to competitively procure resources (most recent ASRFP.
Open source ↗
Full investment case & evidence
Loading the original research archive…
Original research
APS’s planned generation and grid investments will translate into sustained top‑line and cash‑flow growth only if regulators allow those costs into rate base and provide cost recovery via the 2025 Rate Case and subsequent proceedings. If allowed, regulated cost recovery compounds revenue and operating cash flow; if disallowed, growth becomes earnings-dilutive and the stock’s valuation erodes.
Palo Verde ownership provides low‑carbon, high‑capacity baseload that underpins APS’s reliability profile and regulatory positioning, helping preserve revenue stability and favorable cost-of-service treatment. Palo Verde’s continuous output reduces the need for higher‑cost replacements, supports reliability targets and can favorably influence regulatory outcomes on resource portfolios and rates.
Targeted wildfire mitigation and grid‑hardening investments (supplemented by DOE grants) will materially reduce catastrophic outage risk and regulatory/litigation exposure, preserving reliability and limiting large cash‑flow volatility. If mitigation successfully reduces large loss events and liabilities, APS preserves operating cash flow and avoids punitive regulatory penalties; if mitigation fails or events occur, APS faces large one‑time costs and reputational/regulatory damage.
The subscription model for large customers combined with competitive ASRFP procurement will allow APS to serve incremental load (data centers, manufacturers) while ensuring new customers fund required capacity, preventing margin dilution for legacy customers. If the model works and is accepted by regulators, incremental load expands rate base and EPS without socializing costs; if regulators or customers reject it, APS may need to absorb costs or slow capacity additions, compressing returns.
All standing thesis claims
Original report summary
Pinnacle West (APS) is a regulated, capital-intensive utility whose value comes from growing, rate‑base-backed investments (generation, transmission, distribution) that regulators allow it to recover through rate cases, with Palo Verde’s nuclear output and competitive.
Bull case and bear case
Bull case and bear case for Pinnacle West Capital
Where the evidence on Pinnacle West Capital stands: Holding on the latest evidence (Nov 7, 2026). Of its 4 thesis points, 2 strengthening and 2 holding.
Bull case: what the evidence supports
APS’s planned generation and grid investments will translate into sustained top‑line and cash‑flow growth only if regulators allow those costs into rate base and provide cost recovery via the 2025 Rate Case and subsequent proceedings.
Palo Verde ownership provides low‑carbon, high‑capacity baseload that underpins APS’s reliability profile and regulatory positioning, helping preserve revenue stability and favorable cost-of-service treatment.
Targeted wildfire mitigation and grid‑hardening investments (supplemented by DOE grants) will materially reduce catastrophic outage risk and regulatory/litigation exposure, preserving reliability and limiting large cash‑flow volatility.
The subscription model for large customers combined with competitive ASRFP procurement will allow APS to serve incremental load (data centers, manufacturers) while ensuring new customers fund required capacity, preventing margin dilution for legacy customers.
Bear case: what would count against it
Arizona Corporation Commission rejects or materially reduces recovery for the 2025 Rate Case additions or lowers allowed ROE.
Material Palo Verde outages or an NRC license action that reduces availability or imposes large remediation costs.
A major wildfire in APS’s service territory causing substantial damage and customer harm leading to regulatory fines or costly settlements.
Thesis-Break Engine
What has broken in Pinnacle West Capital’s thesis
- Price target fell below the stockcondition set before this filing
Across all companies, this kind of break has happened 1,809 times before. Those stocks trailed comparable companies by a median of 1% over the next six months, and 33% of them trailed it by 10 points or more.
MARKET + FINANCIAL SNAPSHOT
The numbers behind the thesis
What Changed
- MixedRegulation FD disclosure.
Pinnacle West Capital filed an SEC 8-K on 2026-11-06: Regulation FD disclosure. It is a dated development that tests the current thesis.
- MixedReported results of operations (earnings release).
Pinnacle West Capital filed an SEC 8-K on 2026-11-03: Reported results of operations (earnings release). It is a dated development that tests the current thesis.
- MixedRegulation FD disclosure.
Pinnacle West Capital filed an SEC 8-K on 2026-09-30: Regulation FD disclosure. It is a dated development that tests the current thesis.
Risks / falsifiers
What could break the thesis
- Arizona Corporation Commission rejects or materially reduces recovery for the 2025 Rate Case additions or lowers allowed ROE.
- Material Palo Verde outages or an NRC license action that reduces availability or imposes large remediation costs.
- A major wildfire in APS’s service territory causing substantial damage and customer harm leading to regulatory fines or costly settlements.
- ACC rejects subscription construct or imposes conditions that make it uneconomic.
PNW news
Loading headlines…
Financial statements
PNW income statement
Annual filed results · USD · Oldest to newest
PNW: quick answers
- When does Pinnacle West Capital (PNW) report earnings next?
- Pinnacle West Capital's next results are projected for February 24, 2027, from the dates of its own results filings with the SEC. The company has not confirmed the date. It last reported on November 3, 2026. Earnings calendar
- What is PNW's short interest?
- As of October 30, 2026, 13.1M PNW shares were sold short, 10.8% of its shares outstanding, up 4.8% from the count before. At the stock's average daily volume that is 9.2 days to cover. FINRA publishes the count twice a month. PNW short interest history
- Which well-known investors own PNW?
- 1 of the 37 well-known funds tracked here reported PNW shares in their latest 13F filing. By share of the fund's portfolio: Bridgewater Associates (Ray Dalio), 0.1%. Fund portfolios
PNW in well-known investors’ portfolios
1 of 37 funds reported PNW shares in their latest 13F filing.
| Fund | Of its portfolio | Value | Change | Quarter |
|---|---|---|---|---|
| Ray DalioBridgewater Associates | 0.06% | $13.9M | −11.8% | Q3 2026 |

